County Road 50/County Road 5 Interchange at Interstate 35

Co​​unty Projec​t 50-33

​​​​Dakota County, the City of Lakeville and the Minnesota Department of Transportation (MnDOT) are designing an improved interchange at County Road 50/County Road 5 and Interstate 35.

The project team recommends a diverging diamond interchange layout. The decision is based on long-term benefits to traffic safety and mobility while also being among the lowest-cost and smallest footprint of the alternatives.​

Project overview

The county has studied the area for interchange improvements for more than 20 years. The City of Lakeville has also identified parcels for a future interchange.

Currently, the team is reviewing potential traffic impacts during construction and refining details for the project's design and construction. The project will address safety and mobility for all travelers at the interchange and at other connections.  

The county has further developed the diverging diamond interchange for funding and construction while maintaining traffic on I-35. The project will fit into pavement improvements identified by MnDOT. The interchange project limits include:​​

  • County Road 50/County Road 5 between Kenrick Avenue and Klamath Trail (170th Street)
  • I-35 from the CP Railroad bridges to County Road 46 (162nd Street)

The project will require replacement of all county and city roadway infrastructure in the area and two new I-35 bridges over County Road 50. It also includes added and modernized traffic signals, possible noise walls, and improvements to trails and crossings for pedestrians and bicyclists.  

Community engagement

The first community meeting was held Sept. 9, 2024 at Celebration Church in Lakeville.

Open House Display Boa​rds (September 2024)

The second public open house meeting was held Dec. 19, 2024 at the Lakeville Water Treatment Facility.​

Open House​ #2 Display Boards (December 2024)

The third public open house meeting was held June 18, 2025 at Lakeville's Antlers Park Pavilion.​

Open House #3 ​Handout
Open House #3 Display Boards

The county hosted an in-person meeting on March 24, 2026 on the noise walls considered for the project. The meeting was held at the Celebration Church, 16655 Kenyon Ave., Lakeville. 

View an online presentati​on on possible noise walls.

Noise wall voting results

Dakota County sent notices and noise wall ballots to people who were eligible to vote for or against noise walls for this project. Only the property owners or residents and businesses who experience a traffic noise level reduction of at least five decibels from the modeled noise walls were mailed a voting packet.

The vote was conducted between March 11-May 8, 2026. 

If greater than 50 percent of the total eligible points are “no" votes, then the noise wall is removed from the project. If greater than 50 percent of the total eligible points are “yes" votes, then the noise wall will be constructed with the project. View County Road 50/County Road 5 Noise Wall Map.

Wall 1 (West side of County Road 50/5 between Klamath Trail and Kenyon Avenue)

  • Total eligible points: 12
  • Yes points: 0 (0%)
  • No points: 12 (100%)
  • Decision: noise wall will not be built

Wall 2 (West side of County Road 50/5 between Kenyon Avenue and the I-35 southbound on ramp)

  • Total eligible points: 24
  • Yes points: 0 (0%)
  • No points: 22 (92%)
  • Decision: noise wall will not be built

Wall 3 (West side of I-35 from the I-35 southbound on ramp to 178th Street)

  • Total eligible points: 150
  • Yes points: 106 (71%)
  • No points: 1 (1%)
  • Decision: noise wall will be built

Wall 5 (Northeast side of County Road 50/5 between 175th Street W and the I-35 northbound on ramp)

  • Total eligible points: 12
  • Yes points: 0 (0%)
  • No points: 12 (100%)
  • Decision: noise wall will not be built

Wall 6 (East side of I-35, from County Road 50/5 to 1,200 feet north)

  • Total eligible points: 33
  • Yes points: 20 (61%)
  • No points: 0 (0%)
  • Decision: noise wall will be built

Wall 7 (East side of I-35 from 300 feet south of 170th Street to the Metro Transit Kenrick Avenue Park & Ride)

  • Total eligible points: 171
  • Yes points: 9 (5%)
  • No points: 118 (69%)
  • Decision: noise wall will not be built

Wall 8 (West side of I-35 between 162nd Street and 165th Street)

  • Total eligible points: 111
  • Yes points: 71 (64%)
  • No points: 1 (1%)
  • Decision: noise wall will be built
County Road 50/County Road 5 project map

Project timeline

  1. Preliminary design studies and recommendations

    2024-2025

  2. Design refinement

    Confirm project approvals and funding.

    January-July 2026

  3. Final engineering design and right of way acquisition

    Mid-2026-2028

  4. Construction

    Coordinated with I-35 Lakeville pavement improvements​

    2029-2030

Let us know what you think

You can sign up to have project updates sent to your email. You can also give feedback on the project.
Sign up for project emails and give feedback (opens in a new tab)

Project background and links

MnDOT completed a study of I-35 in Burnsville and Lakeville. This focuses on long-term needs and priorities along the freeway corridor. The study is from the I-35E/I-35W split to County Road 70.​

The City of Lakeville developed an Official Map in 2024 to control and influence proposed development and to reserve project right-of-way. See the city's Offici​al Map for County Road 50.

For assistance or more information

Please contact the county's project manager if you have questions or need assistance.

Doug Abere, Project Manager
952-891-7101